Bridge Commences Spec Facility in Rialto


Date

December 18, 2018

Type

Article
Bridge Point South Bay

Bridge Development started speculative construction on Rialto Fulfillment Center 3, a 505,906-square-foot, Class A building in Rialto, CA. Completion on the building is scheduled for Q4 2019.

The facility is located at 12050 Agua Mansa Rd., and will feature a 36-foot clear height, 67 dock-high loading positions, two ground level doors, 254 auto parking spaces, a 185-foot, fully-secured concrete truck court and 151 outside-of-dock trailer storage positions.

//connect.media

Read the full story